Replacement heating for School hall

The brief was to replace the ageing school wall mounted gas heaters which had failed.

MBH designed a scheme to replace these with Air to Air heat pump Air Conditioning units which would provide a low carbon & energy efficiency heating system.

The project was managed and completed by MBH from initial site visit to handover. The gas removal was carried out by our registered Gassafe Engineers. The AC was installed by our registered F-GAS engineers. Mains Electrics was carried out by our approved NICEIC electrical contractor.

A full demonstration and handover were carried out.