Wessex Water
We were very pleased to have won a tender for a Wessex water wtw to replace two damaged caustic solution storage tanks.
This a CDM controlled project required the tanks be cleaned disconnected and with 6 square meters of the roof removed we craned out the two old tanks and replaced them with new Forbes twin skin insulated replacements.
Once in place all reconnected new heating elements and new pipework and wiring. Walkways and new roof sections fitted and tanks filled and commissioned.
Wessex Water were pleased with the complete project.